Before
The pillars installed to support the floor were not enough to keep it from sagging.
During Installation
The holes have been dug for the installation of the SmartJacks.
During Installation
The SmartJacks have been installed. All that is left to do is to pour the concrete!
Before
The beams used to support the floor were not enough to keep it from sagging.
During Installation
The SmartJacks have been installed. All that is left to do is to pour the concrete!
Before
The beams used to support the floor were not enough to keep it from sagging.
Before
The pillars built to support the floor were not enough to keep it from sagging.
After
The concrete is drying around the SmartJacks. The floor will never have sagging problems again!
After
The concrete is drying around the SmartJacks. The floor will never have sagging problems again!
During Installation
The holes have been dug for the installation of the SmartJacks.