Before
The sidewalk has sunken some where it meets the porch.
Before
The sidewalk has settled and is unlevel.
Before
Settlement in the driveway has caused separation at the joints between the concrete slabs.
During
The crew has prepped the area. Small holes have been drilled in the concrete where injection ports will be inserted to ensure that the PolyLevel goes where it needs to go.
During
Another area that has been prepped and is ready for the PolyLevel to be injected.
After
The sidewalk has been lifted back up to it's original position.
After
The driveway and sidewalk have been lifted and levelled! No more tripping hazard!
After
The driveway has been lifted, NexusPro Joint Sealant was used to seal the joints between slabs.